Hi,
I have two Excel files in that i want to compare the Id column in both excel if match. Other Validation is in second excel Date columns current date to less than 7 days (based on Id is match and in between days)we want Considered. if both validation is success. i want take in second excel Name and Project Id column write in PPT.(only Name and Project Id columns inPPT).
Note: If both validation is success after that write in PPT (in PPT Name and ProjectId Columns Based on Both Validation is success).
Excel1.xlsx (9.1 KB) Excel2.xlsx (9.4 KB)
Thanks,