Triggers - option stop (kill) at

Hi. I’d like to propose new feature/option to consider. I know we can set trigger to “strop job after”, but it would be useful to have an option “stop job at” with certain time. Sometimes job start for some reason can be delayed and I assume stop after is also moved (or not?)

Hi, we have the same suggestion. The Trigger Kill/Stop should be processed not after a fix time (Time Start + Time until Kill/Stop) More usefull it will be, if we can set the Job Kill/Stop Time after the Job is running.

Currently we use this option for 2 Processes, only with the reason sporatically the Process freeze, and we can’t find a solution. And if a other Process take more time, this Runtime is stopped.

1 Like

I think this is a valid feedback, and it is now saved in our internal ideas tracker for our Orchestrator team to consider :slight_smile:

2 Likes