Is it possible to push bugs,defects etc to Test Manager that were added prior to integration with JIRA?
If so, I would appreciate it if you could provide some links to documentation/tutorials.
Thanks in Advance!
Please check on below
https://docs.uipath.com/test-suite/standalone/2020.10/user-guide/requirements
Hope this helps!!
You will be able to sync only Requirements and test cases from Jira to Test manager.
Defect can be created from Test manager to Jira when test execution fails.
Defect management should be done in your ALM tool.
Refer to the below link for more details:
Hi @Sharath_HK ,
Thank you for your response, I guess I didn’t describe my question properly so apologies in advance.
I meant to ask if I have created 10 requirements in JIRA prior to integration with Test Manager, is there a way to sync those requirements to JIRA or do I have to recreate them after the integration?
Please let me know if I’m missing anything here as I’m not that familiar with Test Manager and this was a question raised by our client during our POC.
Kind Regards,
Ashwin A.K
Hi @Sharath_HK @lrtetala ,
I’ve found the answer - and its yes.
However, there isn’t a sync-all option and we have to manually sync each item from JIRA to Test Manager.
I hope this helps anyone with similar doubts.
Kind Regards,
Ashwin A.K
if you are asking about syncing requirements and test cases created prior to establishing the connection in test manager, it’s absolutely possible and needs to be manually.
The reference you have shared is correct.
This topic was automatically closed 3 days after the last reply. New replies are no longer allowed.