Hello,
I am developing a process that needs to modify the properties of a particular Schedule on the Orchestrator. In particular, after checking some points, I need the robot to modify the start execution of such an Schedule (ie. It was scheduled to be executed at 9PM and I need to change it to 4PM).
Thanks a lot.