Uipath Control Center -Orchestrator BOS (Older version of back office server)

Currently using Uipath Control Center -Orchestrator BOS (Older version of back office server). We want to schedule the processes for desired time. whether that option is available in Uipath Control center, if so had any body tried and succeeded can you let us know.As we have huge volume to run in this Uipath Control center scheduler option is not there we can’t proceed further.

If we upgrade to latest Orchestrator 2016 what is are new features available?

You should move. At least if you don’t want to manually create every queue table in SQL
Here are a few and there are more coming in2017.1

https://www.uipath.com/release-notes/uipath-v2016.2