I wish there was a way to combine multiple assign activities into a single multi-assign with a single click. Perhaps, we could select the individual activities and right click to see an option to combine. Needless to say, only if we selected assign statements.
I feel this can go a long way in reducing the time it takes to do this manually and improve productivity as well as accuracy.
I am aware of this too. Please read my post. I am asking about a new feature that does not exist in the studio today that will create the multi-assign automatically based on the assign activities I select.
Much like how you can embed one or more activities inside a try-catch without having to do it manually.