Change value of an asset integer

Goodnight

I would like to change the value of an asset
in the orchestrator I set it as “1”

and how is it in a for each I wish it would be changed as a counting variable

and so in the orchestrator change from 1 to 2 or 3 or 4
until any error comes out in the robot

and I can extend the changed value

1 Like

@borismh

Use Set Asset activity to update new asset value to already existing Asset.

3 Likes

This topic was automatically closed 3 days after the last reply. New replies are no longer allowed.