I’m looking to set up a schedule in my manifest file ready for when I move my robot from the DEV to UAT environment.
I would like to set two schedules up. In ‘schedule 1’ which runs at 11am I would like an input bool ('boolRunMacro) to be set to True and in ‘schedule 2’ where the same process runs at 6pm, I would like
the same bool to the set to false. Is it possible to code that in to the manifest file?
Here is a snip of someone else’s manifest - could it be modified to deal with the above?
“process”: {
“name”: “GPC_MP_DataTransfer_MPro5_Performer”,
“description”: “Transferring Data from My Purchasing to MPro5”,
“environmentName”: “gpc”,
“schedules”: [{
“name”:“Data Transfer Performer”,
“cronExpression”:“0 15 8-20 ? * 2-6”,
“robots”:{
“DEV”:[“devrbtgpc4”,“devrbtgpc3”,“devrbtgpc6”,“devrbtgpc2”,“devrbtgpc1”],
“SIT”:[“sitrbtgpc1”,“sitrbtgpc2”],
“UAT”:[“uatrbtgpc1”,“uatrbtgpc2”],
“PROD”:[“prodrbtgpc1”,“prodrbtgpc2”]
It seems that you have trouble getting an answer to your question in the first 24 hours.
Let us give you a few hints and helpful links.
First, make sure you browsed through our Forum FAQ Beginner’s Guide. It will teach you what should be included in your topic.
You can check out some of our resources directly, see below:
Always search first. It is the best way to quickly find your answer. Check out the icon for that.
Clicking the options button will let you set more specific topic search filters, i.e. only the ones with a solution.
Topic that contains most common solutions with example project files can be found here.
Read our official documentation where you can find a lot of information and instructions about each of our products:
Meet us and our users on our Community Slack and ask your question there.
Hopefully this will let you easily find the solution/information you need. Once you have it, we would be happy if you could share your findings here and mark it as a solution. This will help other users find it in the future.
Thank you for helping us build our UiPath Community!