Hi, I have the below requirement in terms of scheduling. Can anybody throw some insights on whether this is possible ?
I need to schedule a process twice in a day.
-
First schedule from 2pm to 6pm and it should be triggered once in every 15 minutes.
-
Second schedule from 6pm to 10 pm which is triggered once in every 2 minutes.
Thanks in advance.