Hi, What i need to do is to open with powerbi, refresh the dashboard and close the powerbi. But it keeps looping the start process activity. How do i stop the looping?
Thanks !
Hi, What i need to do is to open with powerbi, refresh the dashboard and close the powerbi. But it keeps looping the start process activity. How do i stop the looping?
Thanks !
Ideally in the first field of start process you have to procide the power bi executable file location
Cheers
Hi,
Dashboard is the variable of the directory of the powerbi file to be opened.
The problem that i am facing now is the sequence keeps looping. How do i stop the loop?
Is that inside a loop…ideally it wpuld not loop like that
Can you show what you are doing
Cheers
I see it is inside a flowchart…by any chance did you link the sequence to the same sequence again
Cheers