Hi all. I need to schedule a job to run sometimes on the hour, sometimes on the half hour. Is there a way to do this in one schedule? Thanks.
You will need several schedules. There is no way to do this in one schedule in Orchestrator.
2 Likes
This topic was automatically closed 3 days after the last reply. New replies are no longer allowed.