How can I control version of project?, if I run a same project on 10 desktops


#1

Currently I think of now, I will control version by deploy project to 10 desktops for every time when I update project.
Do you have other solution?


#3

Using TFS and then updateyour project in each desktop with TFS.
Please refer https://studio.uipath.com/v2017.1/docs/connecting-your-project-to-a-source-control


#4

Hi madhurim,

Thank you very much.

Best Regards,
Akkapol K.