Hi All,
Does anybody know good way to change connection between Orchestrator and studio?
In my case, there is 2 orchestrator exist, one for develop and testing and one for production. And I would like to upload my numpkg to orchestrator and test my Job, asset etc. Then I would like to upload them to my Production orchestrator but I don’t know how to do it.
If anybody know something way to solve this situation, please let me know.
Actually, I would like to separate asset and Job from production and other environment, does anybody know good way?
J,