hi,
in one of my sequences, i used a read csv activity followed by a write range activity in an excel application scope, and this was the result.
right pic is the csv file that was read from, and left pic is the bot output after writing range. As seen, some cells have the date format switched to mm/dd/yyyy. How can i fix this?
thanks