Just use an Asset. At the end of the automation if it succeeds, put the current date into the Asset. At the beginning of the automation get the Asset value and if the date is within the desired timeframe, stop without processing.
Just use an Asset. At the end of the automation if it succeeds, put the current date into the Asset. At the beginning of the automation get the Asset value and if the date is within the desired timeframe, stop without processing.